A large Edwardian semi with some insulation challenges. The owners wanted to reduce gas usage while keeping a backup for the coldest days.

Property

5-bed semi-detached

Previous heating

Gas boiler

System installed

Worcester Bosch Hybrid + 7kW heat pump

Install time

5 days

Edwardian semi, Henley

Cost breakdown

Gross install cost£18,700
BUS grant deduction7,500
Customer paid£11,200

£850

saved per year

13 years

payback period

The challenge

The property's size and mixed insulation levels made a full heat pump replacement challenging without major radiator upgrades.

Our solution

We installed a Worcester Bosch hybrid system — a 7kW heat pump handles 90% of heating needs, with the existing gas boiler providing backup on the coldest days.

The result

Gas usage dropped by 80%, and the homeowners enjoy lower bills with the peace of mind of a backup system during extreme cold.

The hybrid approach was perfect for our older house. We're using far less gas but still have the backup if we need it.